Verify the Two Dedicated Plants & Quality Control

Factory Verification & QC

Complete Factory Transparency: Verify The Dedicated Plants & Quality Systems

✓
Live Video Audits: Book scheduled 1-on-1 live HD video audits via Zoom, MS Teams, or WhatsApp to inspect production lines and testing facilities.
✓
Full Facility Inspection: Directly inspect raw material storage, cold drawing and welding lines, bright annealing furnaces, and live PMI testing demonstrations.
✓
Verifiable Credentials: EN 10204 3.1 MTC with every order. Exclusive export authorization letters from both plants are available for verification under NDA.

Not every "manufacturer" advertised online owns real production equipment. Before you commit to an order, you should be able to confirm who you're actually buying from, and see the testing that stands behind every tube. Here's exactly how to verify TeCarve, book a live video audit, and review the testing and inspection every shipment goes through.

Two Real, Registered Dedicated Plants

TeCarve Tech Co., Ltd. (Hangzhou, established 2025). TeCarve is a specialized Chinese stainless steel piping solutions provider and the exclusive factory-direct export channel for two dedicated manufacturing plants in Foshan (welded & decorative tubing) and Wenzhou (seamless & precision tubing).

Foshan PlantFoshan, Guangdong
Wenzhou PlantWenzhou, Zhejiang

Exclusive export authorization letters from both plants are available for verification under NDA. TeCarve is a specialized Chinese stainless steel piping solutions provider and the exclusive factory-direct export channel for two dedicated manufacturing plants in Foshan (welded & decorative tubing) and Wenzhou (seamless & precision tubing).

Certificates Held by the Two Dedicated Plants and Specialist Makers

Certificates below are held by the two dedicated plants. Plant legal names, addresses and certificate numbers are withheld on the public site; full copies are available for verification under NDA.

Foshan Plant — Welded & Clad Pipes

Approval Certificate for Materials — Welded Pipes and Fittings - Bureau Veritas (Bureau Veritas Marine & Offshore) Enlarge ↗

Approval Certificate for Materials — Welded Pipes and Fittings

Authority: Bureau Veritas (Bureau Veritas Marine & Offshore)
Standard & scope
Standard: Bureau Veritas Rules on Materials and Welding for the Classification of Marine Units
Scope:
WELDED PIPES AND FITTINGS; Welded pipes in stainless steel grades 304/304L, 316/316L, UNS32205/S31803 and UNS32750.
Valid until: 4 Jan 2029
Environmental Management System Certificate - ZEC (Zhejiang Huanke Certification Center for Environment Co., Ltd.) Enlarge ↗

Environmental Management System Certificate

Authority: ZEC (Zhejiang Huanke Certification Center for Environment Co., Ltd.)
Standard & scope
Standard: GB/T24001-2016 idt ISO14001:2015
Scope:
Production and service of stainless steel (corrosion-resistant alloy, high-temperature alloy, etc.) welded pipes, high-corrosion-resistant clad pipes, and anti-corrosion processing on [...] (corrosion-resistant alloy, high-temperature alloy, etc.) seamless pipe, stainless steel (duplex pipe /super duplex pipe, corrosion-resistant alloy, high-temperature alloy, etc.) pipe fittings, flanges and prefabricated parts.
Valid until: 6 Sep 2027
Occupational Health and Safety Management System Certificate - ZEC (Zhejiang Huanke Certification Center for Environment Co., Ltd.) Enlarge ↗

Occupational Health and Safety Management System Certificate

Authority: ZEC (Zhejiang Huanke Certification Center for Environment Co., Ltd.)
Standard & scope
Standard: GB/T45001-2020 idt ISO45001:2018
Scope:
Occupational health and safety management activities related to production and service of stainless steel (corrosion-resistant alloy, high-temperature alloy, etc.) welded pipes, high-corrosion-resistant clad pipes, and anti-corrosion processing on [...] (corrosion-resistant alloy, high-temperature alloy, etc.) seamless pipe, stainless steel (duplex pipe /super duplex pipe, corrosion-resistant alloy, high-temperature alloy, etc.) pipe fittings, flanges and prefabricated parts.
Valid until: 6 Sep 2027
Qualification Test Record (QTR) — NORSOK M-650 - TÜV SÜD Certification and Testing (China) Co., Ltd. Beijing Branch Enlarge ↗

Qualification Test Record (QTR) — NORSOK M-650

Authority: TÜV SÜD Certification and Testing (China) Co., Ltd. Beijing Branch
Standard & scope
Standard: NORSOK M-650 Rev.4; materials to ASTM A928:2021, NORSOK M630:2020 MDS D42 Rev.6 / D52 Rev.6
Scope:
Welded pipes in S31803, S32205 and S32750; tested thickness 26 mm, qualified thickness up to 32.5 mm.
Valid until: 30 Mar 2028
Approval of Manufacturer Certificate — Steel Pipes and Fittings - DNV Enlarge ↗

Approval of Manufacturer Certificate — Steel Pipes and Fittings

Authority: DNV
Standard & scope
Standard: DNV rules for classification – Ships; DNV-OS-B101 Metallic materials; DNV-CP-0252 Steel pipes and steel pipe fittings
Scope:
Welded austenitic stainless and ferritic-austenitic (duplex) stainless steel pipes.
Valid until: 8 Feb 2027
Approval Certificate for Materials — Welded Pipes and Fittings - Bureau Veritas (Bureau Veritas Marine & Offshore)Enlarge ↗

Approval Certificate for Materials — Welded Pipes and Fittings

Authority:Bureau Veritas (Bureau Veritas Marine & Offshore)
Standard & scope
Standard:Bureau Veritas Rules on Materials and Welding for the Classification of Marine Units
Scope:
Longitudinally welded pipes in austenitic stainless steel and austenitic-ferritic (duplex) steel.
Valid until:11 Oct 2030
Recognition of Manufacturer — Pipe, Tube and Fittings - Bureau VeritasEnlarge ↗

Recognition of Manufacturer — Pipe, Tube and Fittings

Authority:Bureau Veritas
Standard & scope
Standard:Bureau Veritas NR320
Scope:
Stainless steel pipe, tube and fittings including 304, 304L, 316, 316L, 321, 317 and 317L; solution heat treated; maximum dimensions listed on the certificate include 1016 × 40 mm and 762 × 26 mm.
Valid until:25 Jun 2028
Certificate of Authority to Use the API Monogram — API 5LD - American Petroleum Institute (API)Enlarge ↗

Certificate of Authority to Use the API Monogram — API 5LD

Authority:American Petroleum Institute (API)
Standard & scope
Standard:API Spec Q1 and API 5LD
Scope:
Manufacturer of clad steel pipe; processor of clad steel pipe. QMS exclusion: design and development.
Valid until:30 Dec 2026
3-A Symbol Authorization — Metal Tubing (33-03) - 3-A Sanitary Standards, Inc.Enlarge ↗

3-A Symbol Authorization — Metal Tubing (33-03)

Authority:3-A Sanitary Standards, Inc.
Standard & scope
Standard:3-A Sanitary Standard Number 33-03 (Metal Tubing)
Scope:
CIP models: seamless tube 1/4, 3/8 and 1/2 in (6.35–12.7 mm); welded tube 3/4 to 6 in (19.05–152.4 mm). Materials: Types 304, 304L, 316, 316L stainless steel.
Valid until:31 Dec 2026
EAC Certificate of Conformity — TR CU 032/2013 (Pressure Equipment) - Eurasian Economic Union certification body (EAC) Enlarge ↗

EAC Certificate of Conformity — TR CU 032/2013 (Pressure Equipment)

Authority: Eurasian Economic Union certification body (EAC)
Standard & scope
Standard: Technical Regulation of the Customs Union TR CU 032/2013 "On safety of equipment operating under excess pressure"
Scope:
Stainless steel welded pipes for pressure equipment, manufactured to ASTM A358, A312 (ASME SA 312), A790 (ASME SA 790), A928 (ASME SA 928), DIN EN 10217-7 and GB/T 12771-2019.
Valid until: 24 Nov 2027

Foshan Plant — Pipe Fittings

Approval Certificate for Materials — Seamless Pipes and Fittings - Bureau Veritas (Bureau Veritas Marine & Offshore) Enlarge ↗

Approval Certificate for Materials — Seamless Pipes and Fittings

Authority: Bureau Veritas (Bureau Veritas Marine & Offshore)
Standard & scope
Standard: Bureau Veritas Rules on Materials and Welding for the Classification of Marine Units
Scope:
SEAMLESS PIPES AND FITTINGS; Austenitic and austenitic-ferritic seamless stainless-steel fittings (Elbow, Reducer, Tee up to OD 323.8 mm, WT 9.53 mm; Cap up to OD 508 mm, WT 9.53 mm; solution heat treated).
Valid until: 4 Jan 2029
Approval Certificate for Materials — Welded Fittings - Bureau Veritas (Bureau Veritas Marine & Offshore) Enlarge ↗

Approval Certificate for Materials — Welded Fittings

Authority: Bureau Veritas (Bureau Veritas Marine & Offshore)
Standard & scope
Standard: Bureau Veritas Rules on Materials and Welding for the Classification of Marine Units
Scope:
WELDED PIPES AND FITTINGS; Austenitic and austenitic-ferritic stainless steel welded fittings (Elbow, Reducer, Tee up to OD 508 mm, WT 9.53 mm; solution heat treated).
Valid until: 4 Jan 2029
Quality management system for Manufacturer of Materials acc. to Directive 2014/68/EU - TÜV Rheinland (TÜV Rheinland Industrie Service GmbH, Notified Body 0035) Enlarge ↗

Quality management system for Manufacturer of Materials acc. to Directive 2014/68/EU

Authority: TÜV Rheinland (TÜV Rheinland Industrie Service GmbH, Notified Body 0035)
Standard & scope
Standard: QM System acc. to EN 764-5, Clause 4.2 and AD 2000-Merkblatt W0; Directive 2014/68/EU Annex I, point 4.3
Scope:
Manufacture of seamless tubes & pipes, welded tubes & pipes and pipe fittings, see annex 2 revision 4 from 2025-12-04.
Valid until: Dec 2028
3-A Symbol Authorization — Sanitary Fittings (63-04) - 3-A Sanitary Standards, Inc.Enlarge ↗

3-A Symbol Authorization — Sanitary Fittings (63-04)

Authority:3-A Sanitary Standards, Inc.
Standard & scope
Standard:3-A Sanitary Standard Number 63-04 (Sanitary Fittings)
Scope:
Listed models of weld, clamp, BPE, aseptic, I-Line and bevel seat fittings and inspection ports. Materials: 304, 304L, 316, 316L stainless steel.
Valid until:31 Dec 2026
Drinking Water Hygiene Safety Product Permit — Stainless Steel Water Supply Fittings - Health Commission of Zhejiang Province Enlarge ↗

Drinking Water Hygiene Safety Product Permit — Stainless Steel Water Supply Fittings

Authority: Health Commission of Zhejiang Province
Standard & scope
Standard: Regulations on Hygiene Supervision of Drinking Water; Hygienic Safety Evaluation Standard for Drinking Water Distribution Equipment and Protective Materials (2001)
Scope:
Stainless steel pipe fittings for water supply, made from 06Cr19Ni10 (S30408) or 022Cr17Ni12Mo2 (S31603); for conveying drinking water at ambient temperature, max. pressure 1.6 MPa.
Valid until: 19 Apr 2028

Wenzhou Plant — Seamless Pipes & Tubes

Approval of Manufacturer Certificate - DNV Enlarge ↗

Approval of Manufacturer Certificate

Authority: DNV
Standard & scope
Standard: DNV rules for classification - Ships, DNV-OS-B101 - Metallic materials, DNV class programme - DNV-CP-0252 Steel pipes and steel pipe fittings
Scope:
Pipes; Austenitic and ferritic-austenitic steel pipes (Austenitic stainless, 22Cr duplex stainless, 25Cr duplex stainless); Manufacturing method: Seamless; Max. outer diameter: 610mm; Max. wall thickness: 38.89mm; Heat treatment condition: Solution heat treated.
Valid until: 4 Dec 2028
Steel Pipe and Tubes - Lloyd's Register (LR) Enlarge ↗

Steel Pipe and Tubes

Authority: Lloyd's Register (LR)
Standard & scope
Standard: Rules for the Manufacture, Testing and Certification of Materials
Scope:
Austenitic stainless steel pipes up to 610 mm OD and 40 mm wall thickness; duplex and superduplex stainless steel pipes up to 355.6 mm OD and 35.8 mm wall thickness; eddy current testing accepted in lieu of hydraulic testing
Valid until: 7 Mar 2028
Approval Certificate for Materials — Seamless Pipes and Fittings - Bureau Veritas (Bureau Veritas Marine & Offshore) Enlarge ↗

Approval Certificate for Materials — Seamless Pipes and Fittings

Authority: Bureau Veritas (Bureau Veritas Marine & Offshore)
Standard & scope
Standard: Bureau Veritas Rules on Materials and Welding for the Classification of Marine Units
Scope:
SEAMLESS PIPES AND FITTINGS; Seamless pipes in Duplex and Austenitic stainless steel grades.
Valid until: 12 Mar 2027

Shared by Both Plants

Quality Management System Certificate - CQM (China Quality Mark Certification Group) Enlarge ↗

Quality Management System Certificate

Authority: CQM (China Quality Mark Certification Group)
Standard & scope
Standard: GB/T 19001-2016 / ISO 9001:2015
Scope:
Design and manufacturing of metal material seamless pipes, welded pipes, pipe fittings, bends, flanges, forgings, pipe spools and piping components; Manufacturing of metal material lined and clad steel tubes/pipes, clad fittings and clad flanges; Design and manufacturing of metal welding consumables; Manufacturing of metal wires; Hot piercing and machining of metal materials; Pipeline anti-corrosion processing.
Valid until: 30 Aug 2028
Quality management system for Manufacturer of Materials acc. to Directive 2014/68/EU - TÜV Rheinland (TÜV Rheinland Industrie Service GmbH, Notified Body 0035) Enlarge ↗

Quality management system for Manufacturer of Materials acc. to Directive 2014/68/EU

Authority: TÜV Rheinland (TÜV Rheinland Industrie Service GmbH, Notified Body 0035)
Standard & scope
Standard: QM System acc. to EN 764-5, Clause 4.2 and AD 2000-Merkblatt W0; Directive 2014/68/EU Annex I, point 4.3
Scope:
Manufacturing of stainless steel pipes and tubes.
Valid until: 30 Mar 2027
Certificate For Product Conformity - TÜV Rheinland (TÜV Rheinland (China) Co., Ltd.) Enlarge ↗

Certificate For Product Conformity

Authority: TÜV Rheinland (TÜV Rheinland (China) Co., Ltd.)
Standard & scope
Standard: ASME Boiler and Pressure Vessel Code Section II, Part A/B; applicable ASME/ASTM material standard
Scope:
Headquarter: Manufacture of Cold Finished Seamless Stainless Steel Tubes; Manufacture of Welded Stainless Steel Tubes and Pipes; Butt-welding Pipe Fittings; Forged Flanges and Forged Fittings (Approved Material see annex to certificate). Annex lists ASTM A213/A213M & ASME SA213/SA213M (OD 6–127 mm, WT 0.5–12.7 mm) and ASTM A249/A249M & ASME SA249/SA249M.
Valid until: 24 Oct 2028
Environmental Management System Certification Certificate - ZJQC (Beijing Zhongjing Quality Certification Co., Ltd.) Enlarge ↗

Environmental Management System Certification Certificate

Authority: ZJQC (Beijing Zhongjing Quality Certification Co., Ltd.)
Standard & scope
Standard: GB/T 24001-2016 / ISO 14001:2015 standard
Scope:
ENVIRONMENTAL MANAGEMENT ACTIVITIES OF MANUFACTURE AND SERVICE OF STAINLESS STEEL SEAMLESS TUBES & PIPES; ENVIRONMENTAL MANAGEMENT ACTIVITIES OF MANUFACTURE AND SERVICE OF STAINLESS STEEL WELDED TUBES & PIPES AND PIPE FITTINGS.
Valid until: 4 Nov 2027
Occupational Health and Safety Management System Certification Certificate - ZJQC (Beijing Zhongjing Quality Certification Co., Ltd.) Enlarge ↗

Occupational Health and Safety Management System Certification Certificate

Authority: ZJQC (Beijing Zhongjing Quality Certification Co., Ltd.)
Standard & scope
Standard: GB/T 45001-2020 / ISO 45001:2018 standard
Scope:
OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT ACTIVITIES OF MANUFACTURE AND SERVICE OF STAINLESS STEEL SEAMLESS TUBES & PIPES; OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT ACTIVITIES OF MANUFACTURE AND SERVICE OF STAINLESS STEEL WELDED TUBES & PIPES AND PIPE FITTINGS.
Valid until: 4 Nov 2027
Certificate of Manufacturing Assessment - ABS (American Bureau of Shipping) Enlarge ↗

Certificate of Manufacturing Assessment

Authority: ABS (American Bureau of Shipping)
Standard & scope
Standard: ABS Rules, Guides, the associated Specifications and Standards
Scope:
Pipe, Stainless Steel.
Valid until: 20 Mar 2028

Specialist Makers — Fittings, Flanges, Valves & Instruments

Pipe fittings, flanges, valves, pumps and instruments are sourced from qualified specialist makers and inspected by TeCarve before export. These certificates are held by those makers.

PED Material Manufacturer Certificate — Flanges & Fittings - HPi Verification Services (Ireland) Ltd.Enlarge ↗

PED Material Manufacturer Certificate — Flanges & Fittings

Authority:HPi Verification Services (Ireland) Ltd.
Standard & scope
Standard:Pressure Equipment Directive 2014/68/EU, Annex I paragraph 4.3
Scope:
Flanges DN10–DN3500 (3/8–140 in); pipe fittings DN10–DN1000 (3/8–40 in), with EN 10204 3.1 certificates issued by the maker.
Valid until:6 Sep 2027
ISO 9001 Quality Management — Flanges & Fittings - Zhejiang Quanpin Certification Co., Ltd. (QPC)Enlarge ↗

ISO 9001 Quality Management — Flanges & Fittings

Authority:Zhejiang Quanpin Certification Co., Ltd. (QPC)
Standard & scope
Standard:GB/T 19001-2016 / ISO 9001:2015
Scope:
Production and sales of steel forged flanges and pressure pipe fittings within the scope of qualification.
Valid until:24 May 2028
API Monogram Licence — API 6D - American Petroleum Institute (API)Enlarge ↗

API Monogram Licence — API 6D

Authority:American Petroleum Institute (API)
Standard & scope
Standard:API Spec Q1 and API 6D
Scope:
Ball valves, check valves, gate valves.
Valid until:29 Mar 2027
API Monogram Licence — API 600 - American Petroleum Institute (API)Enlarge ↗

API Monogram Licence — API 600

Authority:American Petroleum Institute (API)
Standard & scope
Standard:API Spec Q1 and API 600
Scope:
Bolted bonnet steel gate valves.
Valid until:29 Mar 2027
ISO 9001 Quality Management — Sanitary Valves & Pumps - China Quality Certification Centre (CQC)Enlarge ↗

ISO 9001 Quality Management — Sanitary Valves & Pumps

Authority:China Quality Certification Centre (CQC)
Standard & scope
Standard:GB/T 19001-2016 / ISO 9001:2015
Scope:
Design and production of sanitary valves (butterfly, ball, check, diaphragm and seat valves), pumps (rotary lobe and centrifugal) and fittings.
Valid until:5 Oct 2029
ASME Certificate of Authorization — UV - The American Society of Mechanical Engineers (ASME)Enlarge ↗

ASME Certificate of Authorization — UV

Authority:The American Society of Mechanical Engineers (ASME)
Standard & scope
Standard:ASME Boiler and Pressure Vessel Code
Scope:
Manufacture of pressure vessel pressure relief valves (does not cover welding, brazing or fusing).
Valid until:8 Aug 2029
National Board “NB” Mark Authorization - The National Board of Boiler & Pressure Vessel InspectorsEnlarge ↗

National Board “NB” Mark Authorization

Authority:The National Board of Boiler & Pressure Vessel Inspectors
Standard & scope
Standard:NB-501, National Board Certification of Pressure Relief Devices
Scope:
National Board certified pressure relief devices to the UV designator.
Valid until:8 Aug 2029
PED Module D — Spring Loaded Safety Valve - TÜV AUSTRIA GmbH (notified body 0408)Enlarge ↗

PED Module D — Spring Loaded Safety Valve

Authority:TÜV AUSTRIA GmbH (notified body 0408)
Standard & scope
Standard:Pressure Equipment Directive 2014/68/EU, Annex III, Module D
Scope:
Spring loaded safety valve, type A22F-16P DN50, PED Category IV.
Valid until:16 Dec 2027
Laboratory Accreditation — Safety Valve Maker - China National Accreditation Service for Conformity Assessment (CNAS)Enlarge ↗

Laboratory Accreditation — Safety Valve Maker

Authority:China National Accreditation Service for Conformity Assessment (CNAS)
Standard & scope
Standard:ISO/IEC 17025:2017
Scope:
Testing and calibration capability listed in the accreditation annex.
Valid until:29 Jun 2032
ISO 9001 Quality Management — Safety & Metal Valves - BCC (a Kiwa company)Enlarge ↗

ISO 9001 Quality Management — Safety & Metal Valves

Authority:BCC (a Kiwa company)
Standard & scope
Standard:GB/T 19001-2016 / ISO 9001:2015
Scope:
Design, production and sales of safety valves and pressure piping metal valves. ISO 14001 and ISO 45001 certificates with the same scope are also held.
Valid until:23 Dec 2027
Explosion-Proof Certificate — Electromagnetic Flowmeter - CCRITCEnlarge ↗

Explosion-Proof Certificate — Electromagnetic Flowmeter

Authority:CCRITC
Standard & scope
Standard:GB/T 3836.1, 3836.2, 3836.4 and 3836.7-2021
Scope:
Electromagnetic flowmeter, Ex db ia[ia Ga] q IIC T6 Gb, IP66.
Valid until:15 Dec 2029
Explosion-Proof Certificate — Vortex Flowmeter - CCRITCEnlarge ↗

Explosion-Proof Certificate — Vortex Flowmeter

Authority:CCRITC
Standard & scope
Standard:GB/T 3836.1-2021, GB/T 3836.4-2021, GB/T 4208-2017
Scope:
Vortex flowmeter, Ex ia IIC T6 Ga, IP66.
Valid until:25 Sep 2029

Book a Live Video Factory Audit

No flights required. We offer a scheduled, one-on-one live video factory audit over Zoom, Microsoft Teams, or WhatsApp, at a time that works for you. A typical audit covers raw material storage, the two dedicated plants’ cold-drawing/piercing/welding production lines, the annealing heat-treatment workshop, a live PMI (Positive Material Identification) demonstration, and end-forming and packaging. Below are real photos from the Wenzhou plant's seamless-tube production line, the kind of equipment a video audit will show you in person.

Round steel billets heated in a walking-beam furnace before piercing
Round billets heated in the walking-beam furnace ahead of hot piercing
Hot-pierced tube shell exiting the piercing mill
Hot-pierced tube shell exiting the piercing mill
Cold rolling mill sizing seamless stainless steel tube
Cold rolling (pilger) mill sizing the tube to final dimensions

See it yourself before you commit to an order.

Request a Video Audit

Standard Factory Audit Checklist

Prefer to start with documentation? We can provide:

Qualification & Certification

  • Business license
  • Plant quality-system and class-society certificates (see above)
  • Redacted sample EN 10204 3.1 MTC from the producing plant
  • Historical third-party inspection reports (SGS / TÜV)

Equipment & Capacity

  • Cold-drawing units
  • Seamless tube rolling mills
  • Precision cutting machines
  • Handheld XRF spectrometer (PMI tester), hardness tester, hydrostatic test bench

Quality Control System

  • Incoming material inspection (IQC)
  • In-process inspection (IPQC)
  • Outgoing quality control (OQC)
  • Full traceability — every batch tied to a heat/lot number

EHS & Compliance

  • Environmental discharge compliance documentation
  • Fire safety equipment
  • Standardized 5S workshop management

Plant Testing on Every Order

TestCoverageStandard
Eddy current (NDT)100% of tubesASTM A1016 / EN ISO 10893-2
Hydrostatic pressure100% of tubes; pressure per standard or order (test benches rated up to 20–30 MPa), 5–10s hold—
Chemical composition (OES)Every heat/lotCross-checked against mill certs
PMI (handheld XRF)Every shipment batchPrevents grade mix-ups
DimensionalEvery batchMicrometer, thickness gauge, go/no-go gauges, laser + tape length check

Heat exchanger tubes additionally undergo 100% flattening, flaring/expansion, and bend testing (plus reverse flattening for welded tube), confirming the tube won't crack during tube-sheet expansion in the field. Intergranular corrosion testing (ASTM A262 Practice E or A, or GB/T 4334) is available on request for austenitic and duplex grades.

Third-Party Inspection, When You Need It

For buyers who require independent verification, we've worked with SGS, Bureau Veritas, TÜV Rheinland, and Intertek, most often on oil & gas and heat exchanger export orders to Europe and the Middle East. A typical third-party inspection covers pre-shipment inspection (PSI), dimensional and visual sampling, wall-thickness re-check, on-site witness of hydrostatic/NDT testing, and container seal supervision, with an inspection certificate issued for that specific order.

Material Test Certificates (MTC)

Every order ships with an EN 10204 3.1 mill test certificate as standard, issued by the producing facility's independent QC department and covering chemical composition and mechanical properties traceable to the production heat/lot.

For high-pressure, pressure-vessel, or specified engineering projects, an EN 10204 3.2 certificate is available on request: a customer-nominated third-party inspector witnesses sampling, mechanical testing, and non-destructive testing on-site, then co-signs the certificate alongside the facility's QC lead.

Commercial Terms

Standard Procurement & Trial Order Terms

Transparent commercial terms for standard tube orders, custom fabrication, and trial batches from the two dedicated plants.

Minimum Order Quantity (MOQ)

Standard stainless tubing from 100–300 kg. Capillary tubing from 100 pieces per size. Custom fabrication orders evaluated after technical drawing review.

Free Samples & Prototype Policy

Standard catalog specifications sampled free of charge within 48 hours (freight collect). Custom fabrication prototypes in 5–7 business days; sample fees 100% credited against volume orders.

Production & Delivery Lead Times

In-stock standard tubing ships in 7–10 days. Custom production orders completed in 10–25 days. Special-shaped tube custom samples in 7–15 days.

Certificates & Shipping Terms

EN 10204 3.1 MTC standard with every order. Third-party inspection (SGS, BV, TÜV) on request. Worldwide delivery under FOB, CIF, CFR, or DDP terms.

What Buyers Say

“I've received the goods and everything is fine. Thank you so much sir.”

— Tommy, Nigeria

“The goods already went to my customers. I am waiting for the next order from them.”

— Khalid, Indonesia

“I did not coordinate a third-party inspection this time — but I trust in your product.”

— Carmen, Chile

Frequently Asked Questions

Is TeCarve a trading company or a real manufacturer?

TeCarve Tech Co., Ltd. — TeCarve is a specialized Chinese stainless steel piping solutions provider and the exclusive factory-direct export channel for two dedicated manufacturing plants in Foshan (welded & decorative tubing) and Wenzhou (seamless & precision tubing).

Can I see the factory before I place an order?

Yes. Book a live video audit, or request the standard audit checklist and supporting documentation first.

Do you provide third-party inspection?

Yes, on request, through SGS, Bureau Veritas, TÜV Rheinland, or Intertek.

How does a live video factory audit work?

After booking a time slot, our technical manager connects with you via Zoom, Microsoft Teams, or WhatsApp video call. We guide you through the factory floor in real time, inspecting raw material storage, forming machinery, annealing furnaces, hydrostatic testing benches, and live PMI chemical testing demonstrations.

How do you prevent material mix-ups between grades like 304 and 316L?

The two dedicated plants verify incoming steel coil certificates from primary steel producers such as Tsingshan and TISCO. Optical emission spectrometry at the two dedicated plants verifies melt chemistry. Before dispatch, technicians perform PMI verification on every batch before shipment (piece-by-piece on request).

Ready to verify us yourself?

Request a Video AuditContact Us